Sr. No. | Project Name | State | Country | Client |
---|---|---|---|---|
1 | Consultancy Services for preparation of Project Report comprising, Detailed Survey/Investigation, Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for Construction of Proposed ROBs & their approaches in replacement of Existing Level Crossings in the State of Assam | Assam | India | MoRT&H |
2 | Consultancy Services for Preparation of Detailed Project Report for up-gradation of Shevli (junction of with NH-6 near Sakri) – Nizampur, Chhadvel, Nandurbar, Taloda, Akkalkura section of NH-753B in the State of Maharashtra, Dediapada and terminating at Netrang on NH-56 in the State of Gujarat for Two/Four lane with paved shoulder configuration (Package No- NH/IAHE/12) (Length: - 180 Km.) | Gujarat | India | NHAI |
3 | Consultancy Services for Project Management including Preparation of Feasibility Study / Detailed Project Report (DPR) of selected state road stretches for NH-connectivity to Backward Areas/Religious / Tourists Places (BRT) Scheme. (Section Dharni – Khamla-Achalpur-Amravati-Yavatmal Umri- Karnji on NH-44, Package No. NHAI/B/14) in the state of Maharashtra. | Maharashtra | India | NHAI |
4 | Consultancy Services for Preparation of Detailed Project Report of Selected stretched/ corridors of Road Network in the State of Maharashtra for Upgradation of two lane with Paved shoulders/ four lane Configuration (Package-IV) Nhavra – Inamgaon – Kashti – Shrigonda – Adhalgaon – Jalgaon - Jamkhed, (NH - 548D) in the state of Maharashtra. | Maharashtra | India | MoRT&H |
5 | Consultancy Services for Feasibility Study/Detailed Engineering Report for Construction of Two Lane with Paved Shoulder Newly Proposed National Highway Roads (Approved “In Principle” for Declaration as National Highways) From Junction of NH-48 Near Dudu Connecting Naraina, Sambhar, Nawan, Narayanpura, Kuchaman City, Budsu, Toshina and Terminating At Chhoti Khatu Near NH-458 (Job No. NH-in-principal/RJ/2016-17/888) | Rajasthan | India | MoRT&H |
6 | Consultancy Services for the work of Preparation of Feasibility Study & Detailed Project Report (DPR) for Re-designing, Rehabilitation and Up-gradation of Hisar – Tosham – Badhdha - Satnali - Mohindergarh – Rewari Road (in principal approved NH) in the State of Haryana | Haryana | India | MoRT&H |
7 | Consultancy Services for Carrying out Feasibility Study and Detailed Project Report Preparation for Redesigning , Rehabilitation and Up-gradation to 2 Lane with Paved Shoulders or its Strengthening in the State of Himachal Pradesh for (i) Santokhgarh-Tahliwal-Polian Jajon-Haroli-Saloh-Ispur-Gagret-Daulatpur-Mubarikpur-Marwari (Punjab Border) road-97.30 kms; (ii) Ajouli Santokhgarh Una Lower Lalsingi upto Swan Bridge -22.20Kms; (iii) Bangana to Jawalaji via Shantla-Tutroo-Peer-Saluhi-Chamukha-Kaleshawar Mahadev -39.00Kms (Package no HP/Shahpur/R-1/6). | Himachal Pradesh | India | MoRT&H |
8 | Consultancy Services for Preparation of Detailed Project Report (DPR) for Widening from Single/Intermediate Lane to 2-Lane with Paved Shoulders of Various National Highways in the State of Uttarakhand from Km. 16.00 to 111.35 (Kalsi to Barkot Bend) with Realignment of Km. 44.00 to 59.00 (Due to Submergence in Lakhwar-Vyasi Dam Project) on NH-123 (New No. 507). | Uttarakhand | India | MoRT&H |
9 | Project Management Consultancy Services for Upgradation to Two Lane with Paved Shoulders of Newly Declared NH-440 Vempalli to Chagalamarri (Via), Yerraguntla and Proddutur in the State of Andhra Pradesh - Approximate Length - 80.5 Kms (From Km 50.000 To 130.500) | Andhra Pradesh | India | MoRT&H |
10 | Consultancy Services for preparation of Feasibility study and Detailed Engineering report for widening to Four Lane of NH-11 (New) from Km 57/0 to 129/0 (Jhunjhunu-Chirawa-Haryana Border Section) in the State of Rajasthan (Total length 72.00 Km) | Rajasthan | India | MoRT&H |
11 | Project Management Consultancy Services for Preparation of Detailed Project Report, Pre construction activity and Construction Supervision for the work of Widening / Upgradation to 4 Lane from Km. 564.00 to 603.00 of NH-730 in the State of Uttar Pradesh | Uttar Pradesh | India | MoRT&H |
12 | Consultancy Services for Preparation of Detailed Project Report (DPR) from existing 2 lane to 4-lane from Km.0.000 to Km-68.000 (old chainage Km.197.300 to Km.265.300) of Kanaktora - Jharsuguda Section of NH-49 in the State of Odisha | Odisha | India | NHAI |
13 | Project Management Consultancy Services for Feasibility Study and Detailed Engineering for Widening to 2-lane with paved shoulder and geometric improvements of NH-907A from Km 5/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of Himachal Pradesh | Himachal Pradesh | India | NHAI |
14 | Project Management Consultancy for Project Managerment Consultancy Services for 4 lane of NH 15 from Baihata Chariali (km 0.00) to Start Mangaldoi Bypass (Km 28) connecting NH-15 to NH-27 (old NH-31) (Missing Link) with Junction design and 4 lane of NH-15 from Mangaldoi (excluding Mangaldoi bypass) (Km 42) to Mission Chariali (Km 135) in the state of Assam under Rangia NH Division. | Assam | India | MoRT&H |
15 | Project Management Consultancy Services for Preparation of Detailed Project Report, Pre-construction Activity and Construction Supervision of 2-Laning with paved shoulder from Mokokchung to Watiyim (Length=70.00 Km) on NH-702D in the State of Nagaland. | Nagaland | India | MoRT&H |
16 | Consultancy Services for Preparation of Detailed Project Report for Development of NH-114A from Km 12.325 to Km 62.00 in Deoghar District in the State of Jharkhand. | Jharkhand | India | MoRT&H |
17 | Consultancy Services for Preparation of Detailed Project Report for Development of NH-133 from Km 94.00 to Km 131.00 in Dumka and Deoghar district in the State of Jharkhand | Jharkhand | India | MoRT&H |
18 | Project Management Consultancy Services for Widening to 4-lane of NH-503 Extn. from Km. 0/0 to 28/900 (Amb to Una) in the State of Himachal Pradesh and Widening to 4-lane of NH-70 (New-03) Jallandhar-Hoshiarpur-Gagret-Amb-Nadaun-Hamirpur-TauniDevi-Sarkaghat-Mandi road from Km. 58/400 to 114/00 (PB/HP border to Nadaun) in the State of Himachal Pradesh | Himachal Pradesh | India | MoRT&H |
19 | Consultancy Services for preparation of DPR for construction of 4-lane greenfield Bypasses in Mohanlalganj & Bacchhrawa for NH -30, Gosaiganj, Haiderganj & Gangaganj for NH 731, Lalganj, Mohanganj & Raniganj for NH 31 and Jayas for NH 128 in the state of Uttar Pradesh. | Uttar Pradesh | India | NHAI |
20 | Consultancy services for preparation of Feasibility Report cum Detailed Project Report for Upgradation to six laning of (i) Hoskote-Mulbagal section from Existing Chainage Km. 237+700 (Design Chainage Km. 0+700) to Existing Chainage Km. 302+000 (Design Chainage Km. 64+300) (Length 63.6Km.), and Mulbagal-KNT/AP Border section from Existing Chainage Km. 216+912 to Km. 239+100 (Length 22.188Km.), (ii) Existing 6 lane Hoskote-Mulbagal section for accessing any additional structure/any other facilities from Existing Chainage Km. 302+000 (Design Chainage Km. 64+300) to Existing Chainage Km. 318+000 Km. (Design Chainage Km. 80+424) (Length 16.124Km.) of NH-75 (old NH-4) in the State of Karnataka | Karnataka | India | NHAI |
21 | Project Management Consultancy Services for Preparation of Detailed Project Report, Pre construction activity and Construction Supervision for the work of Widening/ Upgradation to 4 Lane from Km. 472.00 to 505.00 of NH-730 i/c Maharajganj Bypass in the State of Uttar Pradesh. | Uttar Pradesh | India | MoRT&H |
22 | Consultancy Services for preparation of DPR for 4-laning from existing stretch of 2 lane with paved shoulder of approx. length of 85.800 kms on NH-765 from Hyderabad (Tukkuguda) to Dindi (from Ch.23.000 km at Ch. 108.800 km) in the state of Telangana. | Telangana | India | NHAI |
23 | Project Management Consultancy Services for Feasibility Study and Preparation of DPR, Supervision during Construction and Maintenance of NH-627(Pkj-I). | Assam | India | MoRT&H |
24 | Project Management Consultancy Services for Feasibility Study and Preparation of DPR, Supervision during Construction and Maintenance of NH-627(Pkj-II) | Assam | India | MoRT&H |
25 | Monetization of public funded operational National Highway stretcheds: Bids for Selection and Empanelment of Technical Due Diligence Consultants for effective implementation of Asset Monetization program under TOT & InvIT | Various States | India | NHAI |
Our Ongoing Projects
On-Going- Construction Supervision
Sr. No. | Project Name | State | Country | Client |
---|---|---|---|---|
1 | Consultancy Services for Authority’s Engineer for the work “Rehabilitation and Up-Gradation of NH-565 from existing Km. 361/330 (Dornala-T junction) to Km. 420/800 (Penchalakona Junction) to two lane with paved shoulder on EPC Mode in the state of Andhra Pradesh) | Andhra Pradesh | India | MoRT&H |
2 | Consultancy Services for Authority’s Engineer for Widening, Strengthening and Reconstruction of Swai Madhopur to Sheopur from Km. 76/600 to Km. 112/000 Section of NH-552 Extn. In the State of Rajasthan on EPC Mode (Job No. NH-552 Ext,/RJ/2017-18/700) | Rajasthan | India | MoRT&H |
3 | Consultancy Services for Authority’s Engineer for up-gradation to Two lane with paved shoulders configuration for the Section (I) Patgaon to Khopoli Section-I [Design Ch. Km 43+783 to 69+508] and Section (II) Patgaon to Khopoli Section-II [Design Ch. Km 69+508 to 91+139] of NH-548A (part Shahapur-Murbad-Karjat-Khopoli) in the state of Maharashtra on EPC Mode (Package No.: AE-2018/MUM/02) | Maharashtra | India | MoRT&H |
4 | Consultancy Services for Authority’s Engineer for Up-gradation to Two Lane with Paved Shoulders Configuration for the Section (i) Shahpur –Patgaon Section (i) (Design Ch. Km 0+000-20+130) and Section (ii) Shahpur - Patgaon Section (ii) (Design Ch. Km 20+130- 48+783) of NH-548A (Part Shahapur-Murbad-Karjat-Khopoli) in the State of Maharashtra on EPC Mode. | Maharashtra | India | MoRT&H |
5 | Consultancy Services for Authority’s Engineer for Up-gradation to Two Lane with Paved Shoulders Configuration for the Section of Pune/ Raigad District Border to Mangaon (Dist. Raigad) (Design Ch. 69+000 to 103+775) of NH-753F (Part Pune-Paud-Mulashi-Tamhini Ghat-Mangaon) in the State of Maharashtra on EPC Mode. | Maharashtra | India | MoRT&H |
6 | Consultancy Services for Authority’s Engineer for Supervision of “Strengthening and Widening to Two Lane with Paved Shoulder of NH-61 from Km. 40.00 to Km. 72.400 (Package-I) and from Km. 168.00 to Km. 183.783 (Package-II) in the State of Nagaland under EPC mode. High Altitude Road | Nagaland | India | MoRT&H |
7 | Consultancy services for Authority’s Engineer for Supervision of “2-laning of Lalpul – Manmao - Changlang road (NH-215) (Km 0.00 to Km 68.30) on EPC mode in the State of Arunachal Pradesh. | Arunachal Pradesh | India | MoRT&H |
8 | Consultancy services for Authority’s Engineer for Supervision of “2-laning of Longding - Tissa - Khonsa road (NH-215) (Km 0.00 to Km 42.50) on EPC mode in the State of Arunachal Pradesh. | Arunachal Pradesh | India | MoRT&H |
9 | Consultants for Engaging Authority’s Engineer (AE) Services for (i) “Upgradation to Two laning with Paved Shoulders of Ajmer-Nagaur section by executing balance work from Km 0.00 to Km 148.25 on NH-89 (New NH-58) [Job No. NH-89(58)-RJ-2019-20-735] [PKG-I]” AND (ii) “Construction of Upgradation to Two Laning with Paved Shoulders of Nagaur-Bikaner section by executing balance work from Km 161.00 to Km 269.26 on NH-89 (New NH-62) on EPC basis in the State of Rajasthan [Job No. NH-89(62)-RJ-2019-20-734] [PKG-II]”. | Rajasthan | India | MoRT&H |
10 | Consultancy Services for Authority’s Engineer for Supervision of: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 and (Design km 0.000 to km 14.660), (Design length – 14.660 km) on EPC basis in the state of Assam. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800 to Ch.84.100) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of Bilasipura- Guwahati road (NH-17) in the state of Assam on EPC Mode. | Assam | India | NHIDCL |
11 | Consultancy services for Authority’s Engineer for Supervision of: (i) Construction of High Altitude Hill Road from Dembuen to Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode. (ii) Construction of High Altitude Hill Road from Mipi to Mathun (Basam) from KM 0.000 to KM 16.730 in Anini District of the state of Arunachal Pradesh on EPC Mode. | Arunachal Pradesh | India | NHIDCL |
12 | Consultancy Services for Authority’s Engineer for Supervision of Construction/Widening of 2 Laning to 6 Laning of Patna Ring Road from Kanhauli to Ramnagar (SH-78, new NH-131G) with Design Chainage from Km- 0+000 to Km- 39+160 in the state of Bihar on EPC. | Bihar | India | NHAI |
13 | Independent Engineer services for Development of Sinnar to Nashik section of NH- 60(50) from Km.177/00 to 201/350 to four lane on PPP following DBFOT (Toll) in the State of Maharashtra. | Maharashtra | India | MoRT&H |
14 | Consultancy Services for Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 Km to Ch.71.500 Km (Design Ch. 48.655 Km to Ch. 67.556 Km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati Road (NH-17) in the State of Assam under Bharatmala Pariyojana on EPC Mode. (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000 Km to Ch. 99.930 Km (Design Ch.84.100 Km to Ch. 96.000 Km) of the Sagunbashi Forest (near Nichinta) Bypass to the Starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati Road (NH 17) in the State of Assam on EPC Mode. | Assam | India | NHIDCL |
15 | Consultancy services for Authority’s Engineer for Supervision of Balance works of rehabilitation and up gradation of Nakrekal to Nagarjunasagar section of NH-565 to 2L+PS/4L from km 1.000 to km 86.057 under NH(O) for the year 2020-21 in the state of Telangana on EPC Basis. | Telangana | India | MoRT&H |
16 | Consultancy Services for Authority’s Engineer for Supervision of the project “Rehabilitation and Up-Gradation to 2 Lane with paved shoulder from existing Chainage Km 134.950 to Km 166.100 (Design Chainage Km 116.980 to Km 146.700) (Package-VI), under 31 BRTF on Akhnoor-Poonch Road (NH-144A) in the UT of Jammu & Kashmir under project Sampark, Border Roads Organisation (BRO)” on EPC Mode. | UT of Jammu & Kashmir | India | BRO |
17 | Consultancy Services for Authority’s Engineer for Supervision of “Rehabilitation and Upgradation from km 58/635 to 99/409 of Kadapa/Nellore Border to CS Puram (via) Seetharampuram Section of NH-167B to Two lane with paved shoulder Configuration in the state of Andhra Pradesh” And Rehabilitation and Up-gradation of NH-167B from Km 99+103 (CS Puram) to Km 143+320 (Malakonda) to Two lane with Paved Shoulder in Andhra Pradesh through EPC Contract under Annual Plan 2021-22. | Andhra Pradesh | India | MoRT&H |
18 | Consultancy services for Authority's Engineer (AE) / PMC for Supervision of "Construction of two lane with paved shoulder from Km 0+000 to Km 10+603 (UP-Bihar Border to Chandauli) of NH-219 on EPC Mode in the state of Uttar Pradesh. | Uttar Pradesh | India | MoRT&H |
19 | Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from Km 0.000 to Km 10.600 (Package-1) and Km 15.200 to Km 34.500 (Package-3) on Sairang-Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode | Mizoram | India | NHIDCL |
20 | Consultancy services as Authority’s Engineer for Supervision of: (i) Four laning of Jamugurihat to end of Biswanath Chariali Bypass from Km. 182.00 to Km 208.00 of NH-52 in the state of Assam. (ii) Four Laning of NH-52 from end of Biswanath Chariali by pass (Km.208) to Gohpur (Km 265.50) (Total length 57.50 Km) in the state of Assam on EPC basis under SARDP-NE. (iii) Four laning of NH-52A from Gohpur (Km 264.100 on NH-52) to Holongi (Km.20.370 on NH-52A) (Total Length 10.080 Km) in the state of Assam on EPC basis under SARDP-NE. | Assam | India | NHIDCL |
21 | Consultancy Services for Authority Engineer Services for Four Laning of Gazipur - Ballia - Up/Bihar State Border (Greenfield) Section of NH-31 (I) Hridaipur (Km 0.000) to Shahapur (Km 42.500) (Package-I) And (II) Buxar Spur of Length 17.270 Km (Package-IV) in the State of Uttar Pradesh on EPC Mode. | Uttar Pradesh | India | NHAI |
22 | Consultancy services for Authority’s Engineer for Supervision of Work of Widening to four lane with paved shoulder from design km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh. | Uttar Pradesh | India | MoRT&H |
23 | Independent Engineer Services for 4 Laning of Bhiwani Hansi road Section of NH 148B (Design Length 42.934 km) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode. | Haryana | India | NHAI |
24 | Consultancy Services for Authority’s Engineer for Supervision of “Upgradation and Reconstruction of Dindori - Mandla Section of NH 543 from Km. 77+100 (Design) to Km. 170+580 (Design) (Total Length 93.48 Km.) to Two Lane with Paved Shoulder Configuration along with One Time Improvement in 04 Nos. of Bypassed Built-up Areas in a Total Length of 7.23 Km. in the State of Madhya Pradesh on EPC Mode. | Madhya Pradesh | India | MoRT&H |
25 | Consultancy Services for Authority Engineer Services for Construction of 4 Lane Greenfield North - East side Gorakhpur bypass (26.616 Kms) starting from NH-29E (Km 83.308) and end at NH-28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala Pariyojana on EPC Mode. | Uttar Pradesh | India | NHAI |
26 | Independent Engineer Services for Construction of Four Laning of Raghogarh (Design Ch. 29+300/Existing Ch. 29+555) to Nanasa (Design Ch. 92+811/Existing Ch. 95+000) Section of NH-47 (Old NH-59A) (Design Length 63.511 km) under Bharatmala Pariyojana Phase I (Economic Corridor) in the State of Madhya Pradesh on HAM. | Madhya Pradesh | India | NHAI |
27 | Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane divided carriageway with paved shoulder from Km 0+000 to Km 41+210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra on EPC Mode. | Madhya Pradesh | India | NHAI |
28 | Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27+000 (of existing SH-19 Km 26+530) near Hinotiya Village to Design Km 75+700 (of existing SH-19 Km 74+820) near Mehulwa village Section of NH-346 Vidisha –Talbehat of length 48.700 kms in the State of Madhya Pradesh (Package 2) on EPC Mode. | Madhya Pradesh | India | NHAI |
29 | Independent Engineering Services for the work of Rehabilitation and Up gradation of Chorma – Bargania section of NH-227F from Design Chainage Km. 0.000 to Km. 34.566 to two under lanes with paved shoulders in the state of Bihar under Bharatmala Pariyojna Phase-I on HAM Mode. | Bihar | India | NHAI |
30 | Consultancy Services for Authority's Engineer for Supervision of Construction of 4 - Lane Chapra - Manjhi By-Pass Connecting NH-19 and NH-85 (Length-7.155 Km) in the State of Bihar through an Engineering, Procurement and Construction (EPC) Contract. | Bihar | India | MoRT&H |
31 | Consultancy Services of Independent Engineer for Improvement and Up-gradation of NH-74 (New NH-30) Bareilly -Pilibhit - Sitarganj NH-74 (New -30) on following projects-Package-I of Bareilly-Pilibhit from Km 0-00 to Km 32-500 on HAM basis in the state of Uttar Pradesh Package-II of Pilibhit - Sitarganj from Km 32-500 to Km 64-800 Ch 0-00 to 6-00 (Sitarganj Bypass) on HAM basis in the state of Uttar Pradesh -Uttarkhand. | Uttar Pradesh | India | NHAI |
32 | Consultancy Services for Authority's Engineer for Supervision of Up-gradation to 4 lane Configuration for the work of Peth Naka to Sangli Road (Km 0+000 to 41+250 Km) (Length = 41.250 Km) section of NH-166H in the state of Maharashtra on EPC Mode. | Maharashtra | India | MoRT&H |
33 | Independent Engineering Services for the work of Construction of four laning of Bakarpur-Manikpur road section starting from village Chitarsenpur (Km 0+00) and terminating at SH-74 near Manikpur (38+814) at NH-139W under Bharatmala Pariyojna on HAM Mode in the state of Bihar. | Bihar | India | NHAI |
34 | Consultancy Services for Authority’s Engineer for Supervision of “Widening and strengthening to 4L+PS/2L+PS from Km 0.000 to Km 35.800 (Kuakhia -Mangalpur Section) of NH-20 in the State of Odisha on EPC Mode. | Odisha | India | MoRT&H |
35 | Independent Engineer Services for Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial – Warangal) from Puttapaka village at Design Ch. 35.300 Km to Pangidipalle village at Design Ch. 72.350 Km (Total Length 37.050 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur – Vijayawada Corridor on Hybrid Annuity Mode in the state of Telangana (Package-II). | Telangana | India | NHAI |
36 | Authority’s Engineer for Supervision of Project “Up-gradation to Four Lane/ Two Lane with Paved Shoulders Configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 Km. 15/200 to Km. 38/00 and from Km. 58/00 to Km. 84/00 (Design Length 48.55 Km.) of NH-61 on EPC Mode in Thane District in the State of Maharashtra. (TENDER NO. NH/MAH/RO/Mum-1/AE/PKG-4). | Maharashtra | India | MoRT&H |
37 | Consultancy Services for Authority’s Engineer for Supervision of work “construction/ of 4 lane with paved shoulder (Pattan bypass) greenfield bypass from existing Ch. 24.320 to 33.760 and from design Ch. 24.400 to 35.300 (Length 10.900 km) on Srinagar- Baramulla-Uri Road (NH-01) on EPC Mode | UT of Jammu & Kashmir | India | BRO |
38 | Consultancy Services for Authority’s Engineer for Supervision of the work of Construction of 2 lane with paved shoulders (Baramulla bypass) Greenfield bypass from existing Ch. 47+020 to 56+720 and design Ch. From 48+500 to 62+600 (Total Length= 14.100 km) in AOR of 760 BRTF on Road Srinagar – Baramulla – Uri (NH-01) in the UT of Jammu and Kashmir Under Project Beacon, Border Roads Organization (BRO) on EPC Mode | UT of Jammu & Kashmir | India | BRO |
39 | Consultancy Services of Independent Engineer for the following projects; - Start of Shahjahanpur bypass to Start of Shahabad bypass of NH-731 on HAM basis in the state of Uttar Pradesh (Package-2A). Start of Shahabad bypass to End of Hardoi bypass of NH-731 on HAM basis in the state of Uttar Pradesh (Package-2B). | Uttar Pradesh | India | NHAI |
40 | Project Supervision Services (PSS) for execution of various work from KM 44 to KM 82.50 of Dimapur- Kohima new BG Railway Line project involving Engineering works of NF Railway | Nagaland | India | N.F. Railway |
41 | Supervision Consultancy Services During Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli Section Of NH-128 (Total Design Length-162.050 Km Including 13.060 Km Of NH-330) On EPC Mode Under NHDP Phase-IVB in the State of Uttar Pradesh. | Uttar Pradesh | India | NHAI |
42 | Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of “4 laning of Ghaghra Bridge to Varanasi Section of NH-233 from Km. 180.420 to Km. 240.340 [Package -II from Bhudanpur Urban section of start of Gossai bazar bypass] and from Km. 240.340 to Km. 299.350 [Package-III from start of Gossai Bazar bypass to Varanasi] in the State of Uttar Pradesh | Uttar Pradesh | India | NHAI |
43 | Supervision Consultancy services during O&M stage of two lane with paved shoulder from Km. 1.300 to Km. 74.349 (Existing chainage from Km. 1.300 to Km. 74.200) of Chhapra-Rewaghat- Muzaffarpur of NH-102 in state of Bihar (2nd Call). | Bihar | India | NHAI |
44 | Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Package-I, Greenfield Alignment) in the State of Arunachal Pradesh on EPC Mode | Arunachal Pradesh | India | NHIDCL |
Our Ongoing Projects
On-Going - Third Party Techno-Financial Auditors
Sr. No. | Project Name | State | Country | Client |
---|---|---|---|---|
1 | Works executed during flood season 2023-24 | Punjab | India | Department of Finance, Govt of Punjab |
2 | Drainage cum mining & Geology circle WRD, Punjab, Ludhiana | Punjab | India | Department of Finance, Govt of Punjab |
3 | Project of reconstruction of various distributories by concrete lining and other works in Ludhiana and northern Canal and GW divisions of Ludhiana Canal Circle under PIDB | Punjab | India | Department of Finance, Govt of Punjab |
4 | Work executed during flood season in the year 2023-24 under head PIDB | Punjab | India | Department of Finance, Govt of Punjab |
5 | Markfed renovation of Agro Chemical Plant, Mohali | Punjab | India | Department of Finance, Govt of Punjab |
6 | Periodical Repair of plan Road Ludhiana-Malerkotla-Sangrur road | Punjab | India | Department of Finance, Govt of Punjab |
7 | Strengthening of Patiala to Gulha-Cheeka Road (MRD-25) under Head 5054 (RB-10) year 2023-24 in District Patiala | Punjab | India | Department of Finance, Govt of Punjab |
8 | Construction of bus stand Longowal | Punjab | India | Department of Finance, Govt of Punjab |
9 | Construction of Tehsil complex with Fard centre and Patwar station at Batala in district Gurdaspur | Punjab | India | Department of Finance, Govt of Punjab |
10 | Providing and Fixing road safety measures on various link roads category A&B falling in MC Kahnuwan in district Gurdaspur | Punjab | India | Department of Finance, Govt of Punjab |
11 | P/R of Pathankot Amritsar Ganga Nagar Road (section Batala city portion) | Punjab | India | Department of Finance, Govt of Punjab |
12 | Providing and fixing road safety measures on various link roads category A&B falling in MC Qadian in district Gurdaspur | Punjab | India | Department of Finance, Govt of Punjab |
13 | Widening of Batala Kahnuwan Road under head 5054 RB-10 Road works programme | Punjab | India | Department of Finance, Govt of Punjab |
14 | Upgradation of road Dhaipi to Jakhepal via Bir Khurd, Satoj, Tolewal under NABARD-28 Scheme | Punjab | India | Department of Finance, Govt of Punjab |
15 | Upgradation of road Bir Khurd, Khanewal to Satoj under NABARD-28 scheme | Punjab | India | Department of Finance, Govt of Punjab |
16 | Const of HL Bridge over Sirhind Choe on Model Town Sheron to Ghassiwal | Punjab | India | Department of Finance, Govt of Punjab |
17 | Construction of HL Bridge over Drain on Dirba to Kamalpur Road | Punjab | India | Department of Finance, Govt of Punjab |
18 | Construction of HL Bridge over Ladbanjara drain on Ladbanjara to Kheri Nagian | Punjab | India | Department of Finance, Govt of Punjab |
19 | Construction of HL Bridge on Longowal road to Shahpur road over Bhadur Singh Wala Drain | Punjab | India | Department of Finance, Govt of Punjab |
20 | Construction of HL Bridge on Longowal road to Jharon road over Bhadur Singh Wala Drain | Punjab | India | Department of Finance, Govt of Punjab |
21 | Construction of sports in Shaheed Udham Singh ITI Sunam | Punjab | India | Department of Finance, Govt of Punjab |
22 | Construction of HL Bridge on Cheema Fatehgarh Road crossing Sirhind Choe | Punjab | India | Department of Finance, Govt of Punjab |
23 | Construction of HL Bridge over Bhadur Singh Wala Drain on Longowal Sheron Road to Gurudwara Alike Dhab | Punjab | India | Department of Finance, Govt of Punjab |
24 | Construction of bus stand Cheema | Punjab | India | Department of Finance, Govt of Punjab |
25 | Construction of additional class rooms, toilet, stage, new block with GYM hall parking in Govt. Kirti college at NAYAL, Patran District Patiala | Punjab | India | Department of Finance, Govt of Punjab |
26 | Renovation workshop buildings & Agriculture machinery workshop in ITI boys Sunam (4250) | Punjab | India | Department of Finance, Govt of Punjab |
27 | Sheed Udham Singh S.S.S. School Sunam, Sangrur | Punjab | India | Department of Finance, Govt of Punjab |
28 | S.S.S. School Chajli, Sangrur | Punjab | India | Department of Finance, Govt of Punjab |
29 | Govt. Sen. Sec. School of Eminence (Boys) Amloh | Punjab | India | Department of Finance, Govt of Punjab |
30 | Work of modern fair price shop | Punjab | India | Department of Finance, Govt of Punjab |
31 | Repair & Renovation Regarding school of Eminence (Boys) Rupnagar and Nangal | Punjab | India | Department of Finance, Govt of Punjab |
32 | Construction of 30 Bedded CHC at Kauhrian District Sangrur | Punjab | India | Department of Finance, Govt of Punjab |
33 | UPHC at Sector-69, SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |
34 | UPHC at Sector-79, SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |
35 | MCHs at Barnala, Bhatinda, Ludhiana, Fatehgarh Sahib, Mukatsar Sahib, Gurdaspur | Punjab | India | Department of Finance, Govt of Punjab |
36 | MCH at Patti, Talwandi Sabo | Punjab | India | Department of Finance, Govt of Punjab |
37 | Up-gradation of CHCs Lopoke, Bhol Kalota, Sur Singh Wala, Khemkaran, Bareta, Khiala Kalan, Dhakauli | Punjab | India | Department of Finance, Govt of Punjab |
38 | ETP at CHC Khamano | Punjab | India | Department of Finance, Govt of Punjab |
39 | Widening and strengthening of plan Roads Ramdas to Kamalpur in district Amritsar | Punjab | India | Department of Finance, Govt of Punjab |
40 | Widening & strengthening of plan roads Boparai to Baj Khurmania in district Amritsar | Punjab | India | Department of Finance, Govt of Punjab |
41 | Widening & strengthening of plan roads Cheecha to Bhakna in district Amritsar | Punjab | India | Department of Finance, Govt of Punjab |
42 | Widening & strengthening of plan roads Chamyari to Gagomahal in district Amritsar | Punjab | India | Department of Finance, Govt of Punjab |
43 | Widening & strengthening of plan roads Cheecha to Hoshiarnagar in district Amritsar | Punjab | India | Department of Finance, Govt of Punjab |
44 | Construction of high level Bridge 2 span 15 mtr. each over Lahore Br. Canal at km.13 of GT road to Jagdev Kalan via Loharka in district Amritsar | Punjab | India | Department of Finance, Govt of Punjab |
45 | Drainage water resources cum mining and geology Anandpur Sahib | Punjab | India | Department of Finance, Govt of Punjab |
46 | Upgradation of Patiala to Samana Gulha road via Dakala, Karhali Sahib, Kherki Nizamniwala and Kamalpur RC 12.00 to 25.80 | Punjab | India | Department of Finance, Govt of Punjab |
47 | Restoration of Water courses by laying underground pipeline of Bakhra Main Line Canal & Ground water Division | Punjab | India | Department of Finance, Govt of Punjab |
48 | Construction of 5 No. H.L Bridge over Patiala ki Rao Nadi crossing Nayagon Tanda L/R in district SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |
49 | Work executed during flood season in the year 2023-24 under head PIDB AND NON PLAN 4711 | Punjab | India | Department of Finance, Govt of Punjab |
50 | Const. of Critical Care Block in District Hospital Fazilka | Punjab | India | Department of Finance, Govt of Punjab |
51 | Project of cement concrete linning of Suhelewal Rajwaha from RD 0-10930 and Extension from RD 10930-45500 of taking RD 169800/R of main Branch | Punjab | India | Department of Finance, Govt of Punjab |
52 | Overlay on Bhawanigarh-Nabha-Gobindgarh road (SH-12A)/ Total Length: 55.110 km under head 5054 RB-10 | Punjab | India | Department of Finance, Govt of Punjab |
53 | Construction of Class -III (1200 and 900 sqft) and IV (750 sqft) employees housing in Rajindra Hospital, Patiala | Punjab | India | Department of Finance, Govt of Punjab |
54 | Cont. of Cpyte Building at village Borewal Block Budlada Dist. Mansa | Punjab | India | Department of Finance, Govt of Punjab |
55 | Cont. of Cpyte Building at village Kheri Dist. Sangrur | Punjab | India | Department of Finance, Govt of Punjab |
56 | Various Projects under Devigarh canal and Ground water division, Patiala | Punjab | India | Department of Finance, Govt of Punjab |
57 | Work of Providing and Laying of Storm Drainage lines for disposal of rain water of Ecocity-1, New Chandigarh, SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |
58 | Special repair link roads programme MC Dirba and Sullar Yr 2023-24 | Punjab | India | Department of Finance, Govt of Punjab |
59 | Special repair link roads programme MC Sangrur Yr 2023-25 | Punjab | India | Department of Finance, Govt of Punjab |
60 | Const. of HL Bridge 4 span 16.5 M (N) eff. over Sirhind Choe at RD 248782 crossing Sangrur Sunam Road in Dist. Sangrur | Punjab | India | Department of Finance, Govt of Punjab |
61 | Const. of 164 feet wide road from sector 65-66 (Bawa White House) to Sector 66B (300' wide airport road), IT city, SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |
62 | Cost. Of Faculty Housing in Rajindra Hospital | Punjab | India | Department of Finance, Govt of Punjab |
63 | Periodic repair of Sangera Sherpur Road | Punjab | India | Department of Finance, Govt of Punjab |
64 | Const. of Bridge at Thikriwala Village crossing Lisara Drain RD 95000 on Thikriwal to Bhadalwad road | Punjab | India | Department of Finance, Govt of Punjab |
65 | Repair and development works adjacent to N Choe in Block B, Aerocity, SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |
66 | Const. of Dist. Early Intervention Centre (DEIC) at MKH Patiala | Punjab | India | Department of Finance, Govt of Punjab |
67 | Extension of Regional Drug Warehouse at Kharar Dist. SAS Nagar | Punjab | India | Department of Finance, Govt of Punjab |